Phase 1: Discovery, Requirements & Architecture Blueprint
Application inventory, data residency needs and cost envelopes establish the target landing zone across major cloud platforms.
Three pillars. Twelve focused engagements.
DevNord designs and delivers cloud landing zones, replatforms applications and moves data with rehearsed cutovers. EU-region architecture, infrastructure-as-code and observability are built in from day one.
This is the service-specific architecture we design and operate. Inspect any node to see its role, the engineering or QA control around it, and how risk is contained.
Tap any node to inspect it.
Hover over a node to inspect it.
Node inspectorSelect any component to see what it does, which control protects it and how we hand it over.
An indicative 12-week cadence for a full engagement. The exact calendar, milestones and price are fixed in your EUR (€) or SEK (kr) proposal after discovery.
Indicative cadence — finalised in your fixed-scope proposal
Application inventory, data residency needs and cost envelopes establish the target landing zone across major cloud platforms.
Foundation sprints deliver subscriptions/accounts, network, identity and Terraform or Bicep modules before workloads move.
Wave-by-wave migration is validated by manual UAT in each region and by Playwright checks on the promoted endpoint.
Weighted DNS shifts traffic wave by wave; rollback is rehearsed and the platform team receives full IaC ownership.
Every engagement runs with the same operating model: senior squads, transparent ownership and written evidence at every gate.
Two-week sprint cadence with demoable increments and a written decision log.
Transparent Git repository ownership — repositories land in your organisation from day one.
Infrastructure-as-code (Terraform or Bicep) for every environment, reviewed and reproducible.
Fixed-scope proposals in EUR (€) or SEK (kr), with capped B2B consulting retainers when scope is still emerging.
Bilateral NDA signed before source code, architecture data or credentials are shared.
A cloud migration is only as safe as its landing zone. DevNord establishes identity, network segmentation, logging and cost guardrails in infrastructure-as-code before the first workload moves. Workloads then migrate in small waves with a named owner, a rollback path and a measurable success criterion for each wave.
We compare Azure, AWS, Google Cloud, and private cloud environments against your actual constraints — latency, data residency, existing licences and skills — rather than defaulting to one platform. Proposals are fixed scope and priced in EUR (€) or SEK (kr) after the discovery phase.
Virtual machines copied into a subscription do not become cloud-native. Without identity, network segmentation, IaC and observability, costs rise and compliance evidence stays manual.
We build a governed landing zone on your chosen major cloud platform with identity, network, logging and policy-as-code, then move workloads in waves. Each wave has a rehearsed cutover, rollback plan and automated verification.
Policy, identity and audit logging are part of the landing zone, not a later cleanup project.
Move low-risk workloads first, prove the pattern, then accelerate with a repeatable runbook.
Budgets, tagging and right-sizing reviews are part of every migration wave.
These are service-specific, reviewable assets — not status reports. Your team owns each one.
Still unsure? Write to us at [email protected] — we reply in plain language, without a sales script.
It depends on your stack, contracts and data residency requirements. We work across Azure, AWS, Google Cloud and private cloud environments, and the Blueprint Audit compares the realistic options with indicative costs.
Yes. Our landing zones include audit logging, identity controls, encryption and evidence packs designed for EU regulatory expectations.
We design for it using weighted DNS or traffic manager routing, dual-run windows and rehearsed rollback. Maintenance windows are agreed only where a legacy protocol makes them unavoidable.
We include a licence and cost review in the audit so you know which commitments to renew, replace or retire before migration.
Start with the Blueprint Audit and get a costed multi-cloud landing zone design and sequenced migration waves.