Delivery model

Four stages. One outcome: a migration you can actually trust.

We replace migration theatre with an engineering pipeline you can inspect at every step — from the first dependency graph to the last traffic shift.

The pipeline

From uncertainty to ownership

Each stage has explicit entry criteria, named outputs and a decision point for your team.

01

Discovery, Requirements & Architecture Blueprint

Two weeks to a shared, evidence-based view of what you actually have.

  • Repository, configuration and CI history ingested into our analysis pipeline
  • Call graphs, change-frequency hotspots and hidden integrations identified
  • Two focused remote working sessions with the engineers who know the system
  • Target platform, data residency and cost envelopes compared
Stage output

Architecture Blueprint PDF · dependency map · ranked risk register

02

Core Sprint Engineering & Iterative Milestones

Design the seam before writing the replacement.

  • Bounded contexts and data ownership agreed with your product owners
  • Anti-corruption proxy defined with versioned API contracts
  • Extraction sequence ranked by business value and technical risk
  • Rollback path and traffic-shift strategy documented for every slice
Stage output

Target architecture · OpenAPI contracts · migration backlog

03

Hybrid QA Validation (Manual UAT + Automated Regression)

Modernisation runs alongside your roadmap, never instead of it.

  • Senior squads ship in two-week sprints with demoable increments
  • Characterisation tests capture current behaviour before refactors
  • Playwright E2E and API contract suites gate every pull request
  • Ephemeral preview environments for stakeholder review
Stage output

Clean repositories · 90%+ automated suite · green CI pipeline

04

Zero-Downtime Production Deployment & Handover

Traffic moves gradually. Ownership moves completely.

  • Weighted routing and feature flags shift traffic slice by slice
  • Rollback rehearsed before production, with live SLO dashboards
  • Terraform/Bicep, runbooks and observability handed to your team
  • 30-day hypercare with a named senior engineer and defect SLA
Stage output

Live cloud platform · documentation · 30-day hypercare

Fixed-scope entry point

The 2-week Blueprint Audit: fixed scope

Every large migration starts with a small, fixed decision. The Blueprint Audit gives your steering group the evidence needed to approve, reprioritise or stop — before a large delivery budget is committed.

  • Fixed-scope proposal in EUR (€) or SEK (kr) — no time-and-materials surprises
  • Ten working days from kickoff to readout
  • Read-only repository or staging access — zero disruption to your live production environment
  • The Blueprint is yours, with or without a delivery contract
EUR / SEK10 working days · fixed scope
  • Code, config and CI dependency analysis
  • Two remote engineer working sessions
  • Risk-ranked extraction sequence
  • Multi-cloud target architecture + cost envelope
  • Playwright QA baseline
  • 90-minute executive readout
Book the audit No lock-in. The Blueprint is yours to keep.
Working principles

How we behave while we build

NDA-first

We sign before source code or architecture data changes hands.

Remote by design

One cloud-first studio serving Nordic and European teams across time zones.

Shared ownership

Your team receives the repositories, infrastructure code and runbooks at handover.

Senior throughout

The people in the audit are the people who engineer the cutover.

Structured delivery data available at https://devnord.se/how-we-work/.

Next step

Ready to see your own system on a blueprint?

Book the fixed-scope Blueprint Audit with a proposal in EUR (€) or SEK (kr). Two weeks from now, the migration conversation will be based on evidence.